Scheduling System Dev for AC Manufacturing Company
Please find under a summary covering project details and feedback. The innate facts are kept as they are, private information is amended.
Introductory information
A fast induction on the buyer’s organisation
I’m a director for Sygnal Automation, a manufacturer of electronic controls for air conditioning and lighting methods.
Desired goal
What challenge were you trying to address with Differenz System?
We needed to educe a work and part treatment method for our origination line. It had to be able to schedule our work and fix we had sufficient parts to create what we needed to create on the origination line.
Provided solution
What particular tasks were Differenz System responsible for?
They built the method themselves from scratch based on our specification that said what we wanted it to be able to do. They built a database and hosted it on AWS so all our users can approach it at the same time. The tool allows us to put in the experiences nation need to accomplish each part of the meeting for each fruit, as well as what parts are needed.
Was there a dedicated team?
We worked with three nation.
How did you come to work with Differenz System?
They seemed to apprehend the project straightaway. We had a few nation look at it, and Differenz System’s cost was very reasonable.
What are you approach expents (if diclosed)?
We spent $25,000 on this project.
What is the terminal result of working with Differenz System?
We worked unitedly from March 2014 until August 2015.
Results achieved
What evidence can you share that demonstrates the contact of the engagement?
When we put origination orders in, the method lets us know in advance if we have shortages in work or parts and how to address them. We have fruits that can hold up to 100 ingredients, so being out of one ingredient can shut down the total origination line.
Beforehand, all was manual. Now, we have an automated method that takes care of all the issues changed our business dramatically. We’re able to quit major roadblocks and hiccups in getting our fruits out in the marketplace. It helps us schedule forward.
How did Differenz System accomplish from a project treatment standpoint?
They’re interactive and good at care us up to date. We barely use them now owing we have so few issues with the server, but they quiet let us know almost holidays coming up and tell us if they’re not going to be useful in advance.
What is (from your point of view) the key factor to pay observation while intercourse with Differenz System?
If I had a issue, since I’m not a technical individual, I could give them an delineation of how they’d do it. They’d come back with lots of options for me, including cost considerations.
What aspects of their work would you like to get improved?
No, not veritably. I was very impressed.