Web Development for Alternative Energy Innovation Firm
Please find under a summary covering project details and feedback. The innate facts are kept as they are, private information is amended.
Introductory information
A fast induction on the buyer’s organisation
I’m the ruler of marketing for a clean energy organisation that’s committed to eliminating the need for fossil fuels in all sectors of the administration. We’ve created and patented a technology that concentrates sunlight on temperatures high sufficient to replaces fossil fuels. For entreaty, we can make bind using the faculty of the sun.
Desired goal
What challenge were you trying to address with Interactivism?
We didn’t have an online nearness of any kind owing our team has been working to consummate our technology through R&,D phases and propel preparations. So, we needed to get the word out almost our philosophical breakthrough.
Provided solution
What particular tasks were Interactivism responsible for?
We innately needed a landing page that degoods the breakthrough and explains its functions as well as it’s intended hearers. The page was supposed to be pretty high-level. While it is a landing page, the website is a bit more strong than that. The end WordPress website is glossy and provides all the certain touch information for our team.
Was there a dedicated team?
I worked with three nation on their team. Our main point of touch was a co-founder who architected the UI/UX. We also had a front-end developer and a backend developer.
How did you come to work with Interactivism?
They came bigly recommended from a large-scale tech incubator. In our search, we also considered two other agencies. We ended up selecting them owing of the condition of their work, their affordable cost points, and their close neighborhood to our offices. They’re located on the same street as our team.
What are you approach expents (if diclosed)?
We spent between $25,000–$50,000 on their services.
What is the terminal result of working with Interactivism?
The engagement lasted from May–November 2019.
Results achieved
Are there any measureable or plum results?
The terminal website is top-tier, glossy, and present. From soup to nuts, they delivered. Our activity doesn’t necessarily prioritize design, as long as the interaction is adjoind. They not only enabled us to adjoin a interaction, but it has resonated extremely well with nation. Their team incorporated a very clean, intuitive design. I couldn’t be happier with the results.
How did Interactivism accomplish from a project treatment standpoint?
The team was affable and helpful with information throughout the process. They use Slack for interaction and Dropbox for file sharing. Throughout the project, we worked off a timeline that was presented to us at the commencement of the outgrowth. It included milestones that helped push the engagement along. We stuck to those milestones owing they held us responsible to them. It was a big relationship, and they were useful throughout.
What is (from your point of view) the key factor to pay observation while intercourse with Interactivism?
They propose a individualal touch through their accessibility and responsiveness. Our main touch reaches out even behind the propel to check in and thank us for our collaboration. They propose to fix or harmonize anything on the website that needs observation. Actually, they sent over a list of recommended improvements, which we implemented on the day of the propel. That was hectic, but they were correcting things as they broke throughout the leading night to get things running smoothly.
What aspects of their work would you like to get improved?
There is a second phase programned for the website, and they’ll be high on our website of vendor options. I don’t have anything denying to say as of now. It’s all been real.
Do you have any advice for possible clients?
For any engagement, make sure that you have a point individual on your end to take responsibility for milestones. Otherwise, your team will be a big holdup in getting your own project artistic. This works both ways, so they should attribute a project director to you as well. It takes two to tango.